(VACNE) - The VACNE office has just received 5 articles from Ths. Phạm Văn Sơn, General Secretary of VANE and Director of the Vietnam Environmental Incident Response Center (SOS), who recently attended the 44th Conference of the ASEAN Federation of Engineering Organizations (CAFEO 44, Bandung, Indonesia, October 20-22, 2026). We are pleased to share them with our readers.
Part 1
LESSONS FROM BANGKOK WHEN FLOODWATER CANNOT REACH THE PUMPS
Large pumping stations have been built, yet many neighbourhoods are still waiting for floodwater to recede. Discussions of Thailand’s experience at CAFEO 44 highlighted a fundamental issue in urban flood management: water must be able to reach the pumps, and the entire drainage route must function effectively. For residents, every hour saved means less anxiety and less damage.
In late September 2026, Bangkok faced another severe flood. On 27 September, Reuters reported nearly 300 mm of rain in 48 hours, with roads and residential areas inundated. Even after the rain eased, water levels in some major canals remained high as runoff continued to arrive from surrounding areas.
Less than a month later, Thailand’s flooding was discussed at the Disaster Preparedness Working Group meeting during CAFEO 44 in Bandung. Professor Panuwat Joyklad, the group’s Chair, recalled the floods of 2011 before examining heavy rainfall within the city itself and the difficulties facing its drainage system.
One important point emerged from his analysis: large pumping stations were available, but the water could not reach them. It had to pass through small canals whose capacity was insufficient for the volume that needed to drain away. These delays kept homes flooded and prolonged disruption to travel and livelihoods. For families waiting for the water to recede, resolving these bottlenecks was an urgent concern.
FOLLOWING THE ENTIRE DRAINAGE ROUTE
The 2011 floods marked a turning point in Thailand’s water management. The World Bank estimated total damage and economic losses at US$46.5 billion. Following the disaster, Thailand advanced integrated water management programmes, including improvements to canals and associated infrastructure across river basins. In information published in 2023, the World Bank described a planned component involving improvements to 23 canals and related water infrastructure.
This experience shows why flood management must be assessed along the entire drainage route, from where water accumulates to where it is discharged. Before reaching a pumping station, water must leave residential areas, pass through drains, enter smaller canals and then reach the main canal. A narrowed section or an improperly operated control gate can reduce the effectiveness of the whole system. Increasing pumping capacity may not resolve flooding further upstream if the channels leading to the pumps remain constrained.
Conditions at the receiving end also matter. When water levels in receiving rivers or canals are high, drainage capacity may differ greatly from that under normal conditions. A drainage route therefore needs to be assessed against specific combinations of local rainfall, inflows from surrounding areas and downstream water levels. Such analysis must use local data; a solution developed for Bangkok cannot simply be transferred unchanged to a Vietnamese city.
The presentation also drew attention to changes in the scenarios that communities must prepare for. Preparations for floodwater arriving from upstream may not be sufficient for intense rainfall concentrated within the city. The two situations may require different operating procedures, even where they share parts of the same infrastructure. Earlier lessons remain valuable, but they must be reviewed against changing conditions so that preparations reflect what may actually happen.
PREPARING WHILE THERE IS STILL TIME TO ACT
Drawing on these lessons, Vietnam could begin by examining flood-prone locations in the context of their entire drainage routes. The causes need to be identified at each location: inadequate capacity to collect runoff, narrowed channels, unsuitable operating procedures or insufficient capacity in the receiving waterway. Technical specialists should work with operators to observe conditions on the ground and listen to residents about where water regularly accumulates and how patterns change from one rainy season to the next. Understanding the causes will help identify the investment, repairs or maintenance needed to improve conditions sooner.
This review should also clarify management responsibilities and coordination arrangements. A drainage route may cross several administrative areas and be operated by different organisations. Work along its individual sections needs to be coordinated, because wherever water backs up, residents continue to suffer. Operational exercises based on heavy rainfall, power failures or high water levels in receiving waterways can help organisations test how they work together and identify problems that can still be addressed before the storm season.
The CAFEO 44 discussions also touched on preparing evacuation shelters. Early warnings are truly useful when people know what to do: which route to take, where to go and who will assist those who are ill or have difficulty moving. Families caring for someone with additional needs also require suitable transport and assistance. Careful advance preparation can reduce confusion and danger when the water rises.
Pham Van Son, Director of the Vietnam Environmental Incident Response Center, raised a further question about chemical storage facilities, fuel depots and waste treatment facilities in flood-prone areas. Unless protected in advance, these sites can release hazardous substances into floodwater, carrying them into residential areas, farmland and domestic water supplies. The consequences can extend beyond flooded homes and disrupted transport to exposure, poisoning and lasting contamination, depending on the substances involved and the quantities released. A particular concern is that hazardous substances may remain in mud, soil and wells after the water recedes, in the very places where people return to clean up and rebuild their lives. These harms may not be immediately apparent, while remediation can be complex and costly. Flood preparedness must therefore include the safe storage and containment of chemicals, fuel and waste, so that people who have survived a natural disaster do not then face further, potentially far-reaching harm from pollution.
This question points to a practical task for local authorities before the storm season: identify facilities at risk of flooding, check how hazardous substances are stored and agree on response points of contact. Protective measures must be appropriate to each substance and facility, with qualified personnel responsible for their implementation.
The lesson from Bangkok calls for close attention to the entire path of floodwater: where it will flow, where it may be held back, which organisation needs to act and how the response should be coordinated. The experience shared at CAFEO 44 will have greater value when it is carefully studied and adapted to address local problems. For practitioners, dedication means persisting in the search for causes and working together to resolve them, so that fewer people are cut off, losses are reduced and communities can return to normal life sooner.


Professor Dr. Panuwat Joyklad, Chair of the AFEO Working Group on Disaster Preparedness and Mitigation, representing the Engineering Institute of Thailand (EIT).